Examples of 'cutover' in a sentence
Meaning of "cutover"
Cutover is a term used in project management and technology to describe the process of migrating from an old system to a new one, typically involving cutting over from the old system to the new system
Show more definitions
- Having been cleared of valuable timber.
- An area of cutover land.
- The discontinuity that occurs when switching from the Julian calendar to the Gregorian calendar.
- The process of quickly replacing a telephone switchboard, in which the connections are duplicated to the new machine and the original connections are then suddenly disconnected.
How to use "cutover" in a sentence
Basic
Advanced
cutover
Cutover to new services without interruption of service.
Obviously this means there is no automatic cutover.
Cutover with production test.
Their only inheritance is a worthless strip of cutover mountainside.
The cutover land suffered further from multiple forest fires.
Method and device for user information cutover.
A cutover is a sharp seam that has fractured and is considered a serious seam defect.
The importance of a cutover plan.
Prepare cutover strategy, plan and checklist.
Coup de taille cutover.
How does the cutover procedure look like?
The suspension duration depends on the time spent in the cutover.
Reliable Controls Corporation personnel performed a successful cutover within the time frame required by the client.
After the data cutover test is passed, it will be officially launched.
Will you be performing a cutover migration?
See also
At the intersection, cutover may happen at a precise physical location.
Then a doe appeared, and the three of them bounded up the cutover.
O Participate in cutover activities.
That is, the user information of one user is used as a unit for cutover.
Access allowed from cutover to resource-based tourism value.
Cutover activities ensure that preparatory steps are complete and staff members are ready for go-live.
Rapid implementation that enabled the cutover of all 28 initial sites at once during the day.
FIG 3 is a flowchart of another exemplary user information cutover method.
FIG 7 shows a cutover scheme in an application embodiment of the present invention ;.
One application embodiment is based on the cutover scheme shown in FIG 7.
The cutover to the new ERP system takes place in steps, one module at a time.
FIG 5 is a flowchart of a user information cutover method in an embodiment of the present invention ;.
Large cutover areas, however, are unpopular with the public.
FIG 6 shows a structure of a user information cutover apparatus in an embodiment of the present invention ;.
For the official Go-Live there is, however, a small cutover window.
For outdoor fiber optic cable cutover time . Open center beam tube outer diameter have four.
O Why was November chosen as the cutover date?
A user information cutover apparatus, characterized by comprising,.
DETAILED DESCRIPTION First, the architecture of a user information cutover system is described below.
A user information cutover method, characterized by comprising,.
Converting data is often the ‘ big piece ' of the cutover puzzle.
A user information cutover method, comprising:.
The widespread, shallow root system facilitates regeneration by " suckers " on cutover and burned land.
A user information cutover apparatus, comprising:.
The rapid application development method contains four phases, requirements planning, user design, construction, and cutover.
Training, cutover and deployment.
Deployment proceeds as above through the entity realization phase, cutover and post-go-live support.
This is because cutover migration performance suffers when you try to migrate more than 150 mailboxes.
Deployment to this cluster progresses through the entity realization phase, cutover and post-go-live support.
Implementation,, Prepare cutover strategy, plan and checklist,, User training.
FIG 4 shows an exemplary structure of a user information cutover apparatus ;.
Cutover migration Fewer than 150 seats A week or less.
As shown in FIG . 1, a first exemplary user information cutover method includes the following steps,.
The area under study was a 3-year-old forest cutover.
BSP were compared 15 years after a cutover in Quebec.