Examples of 'engineering change' in a sentence
Meaning of "engineering change"
Engineering change refers to modifications or updates made to a product or process, usually in the field of engineering or manufacturing. It involves altering the design, structure, or components of a system to improve its functionality or performance
How to use "engineering change" in a sentence
Basic
Advanced
engineering change
Engineering change management in collaborative product development.
O number of days to process engineering change notices.
O number of engineering change detected after design review.
The customer discovers that an engineering change is vital.
This important engineering change affects to the water collection area of the device.
Frequent changes in customer orders and engineering change orders.
Reviews and recommends engineering change requests and contract amendments.
Evaluating the cost of proposed solutions to an engineering change order.
Engineering change effort refers to modifications from existing production configuration to incorporate different tape widths.
Product development and supply chain collaboration in engineering change orders.
Analyze and write Engineering Change Orders of each product.
Flexibility for preparing design modifications and initiating engineering change orders as required.
When improperly managed, engineering change orders can vastly increase costs.
Improve quality control across the supply chain and effectively manage engineering change controls.
O online access to engineering change orders by engineering, marketing and manufacturing departments.
See also
Joshua sees advocacy as an important medium in engineering change in Africa.
Engineering change authorization, a document that shows the detailed description of the change.
Withdraw sponsorship and end participation in the Engineering Change Lab immediately.
O instituting engineering change control procedures, evaluating proposed changes and negotiating revised costs ;.
Are there hard and fast rules for engineering change order ( ECO ) processes?
Engineering Change Proposals not systematically evaluated for cost / capability implications.
With these tools, you can reduce engineering change orders ( ECOs ) and increase final assembly productivity.
To facilitate collaboration, engineers may use an Engineering Change Notice ( ECN ).
Our expertise in Engineering Change Management improves our client 's capabilities,.
Microsoft announced this engineering change Dec. 6.
Value engineering change orders ;.
At Renishaw, we have spent nearly 50 years engineering change.
Product modified by an engineering change to design records, specifications, or materials ; or.
O Engineering change -- Proposing, evaluating, deciding on and implementing engineering changes.
The first engineering change notice to the USB 2.0 specification added mini-B plugs and receptacles.
On engineering change at the UN, “ I am not there to play . ”.
You'll also be interested in:
Examples of using Engineering
Show more
Models formulae engineering designs and specifications
Claims that foods are products of genetic engineering
Engineering and architecture projects focused on the
Examples of using Change
Show more
Ming will not change his mind
Change duct size gradually to minimize turbulence
You can even change your name to