Examples of 'load box' in a sentence
Meaning of "load box"
load box: This phrase could refer to a container or package designated for loading items. It may describe a box or receptacle intended for holding, transporting, or storing various objects or materials, emphasizing its function related to loading procedures
How to use "load box" in a sentence
Basic
Advanced
load box
The trailer load box is mounted on them.
Load should be distributed evenly in load box.
Withdraw the load box interlock if it is extended.
Conduct test tipping of load box backward.
The load box is mounted on sand spreader frame.
Type of load carried depends on load box use.
Lower the load box before proceeding to deal with a malfunction.
Always aim at distributing the load uniformly in the load box.
Conduct test tipping of load box backward and sideways.
Load box is a structure welded from steel sections and sheets.
During this work the load box may not be raised.
Exercise caution when climbing on top of the trailer load box.
Drive the trailer away from the load box in order to disconnect it.
Ensure that during unloading nobody is near tipped load box.
Ensure that there are no bystanders in the load box unloading or loading zone.
See also
Torque is directly transmitted to right front auger conveyor placed in load box.
One of the major components of the load box is the chain conveyor.
Set braking force regulator according to the degree of loading of the load box.
After unloading the load box should be thoroughly cleaned using strong waterjet.
Conveyor belt tightening should be performed only when the load box is empty.
When raising the load box the trailer must be hitched to the tractor.
The design of the upper frame enables tipping the load box back.
Pins connecting the load box with the lower frame are secured against falling.
These seats are the pivot point when the load box tilted backwards.
Before entering load box prevent trailer moving with parking brake and chocks.
Trailer with net extensions may only be unloaded by tipping load box to the rear.
Side walls and optionally load box extension walls should be protected in a similar manner.
Construction materials can be transported using the trailer provided the load box is properly prepared.
Before raising load box the tipping pins should be placed on the intended unloading side.
If the load does not pour from the raised load box immediately cease unloading.
Before entering load box or on platform disconnect tractor engine and remove key from ignition.
Keep a safe distance from electric power lines during unloading and when load box is raised.
Do NOT tip load box in strong gusty winds conditions.
Do NOT move off or drive when load box is raised.
Do NOT climb on load box during loading and unloading.
Do NOT proceed with disconnecting trailer from the tractor when load box is raised.
Do NOT tip the load box when tailgate is closed.
Total length Total width Total height Axle track Internal load box dimensions.
If needed, unlock the load box if the load box position should be changed.
After completing unloading, ensure that the load box is empty.
Raise the load box slide gate if included in the manure spreader 's equipment.
Remaining 4 auger conveyors are placed in two parallel channels of load box.
The load in the sand spreader 's load box must be distributed uniformly.
Place slow-moving vehicle plate on the rear wall of the load box.
During unloading through chute, load box must be raised slowly and smoothly.
The unit is installed in the rear section of the manure spreader 's load box.
Gradually raise the load box using switch, which controls manifold operation.
Place a slow-moving vehicle warning sign on the rear wall of the load box.
Set the load box position on the trailer frame, depending on the load box length.
Press and hold the push-button for withdrawing the load box interlock.